Video - ULSTEIN´s barge and crane at work for STX OSV


Videa Terex Cranes ULSTEIN´s barge and crane at work for STX OSV



ULSTEIN´s barge and crane at work for STX OSV

Ulstein Group´s "FLEX" barge and Terex CC2800-1 on their way to work for STX OSV and their newbuild 719, the cable laying vessel "AMC Connector", early October 2011.

Ulstein, FLEX, barge, crane, Terex, CC-2800-1, STX OSV, AMC Connector

Videa

Délka: 2 minut : 6 sekund
Autor: UlsteinGroup1
Shlédnutí: 532 x
Hodnocení: 5.0 / 5   (1 x)