This job consisted of a single day mix and dry-up to a depth of 18" at 3% lime ratio. Soil engineers approved the incorporation of all existing vegetation with the mix and Dry-up process. Since this was a dry-up only, compaction of the soil was not required. The contractor is to finish and balance the site. Specs 18" depth 3% lime One Day, without compaction